Sign In | Join Free | My himfr.com
Home > BIW Engineering >

Chery Kaifeng Plant 30JPH Capacity Improvement Project

Guangzhou Kinte Electric Industrial Co., LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Chery Kaifeng Plant 30JPH Capacity Improvement Project from wholesalers
     
    Buy cheap Chery Kaifeng Plant 30JPH Capacity Improvement Project from wholesalers
    • Buy cheap Chery Kaifeng Plant 30JPH Capacity Improvement Project from wholesalers
    • Buy cheap Chery Kaifeng Plant 30JPH Capacity Improvement Project from wholesalers
    • Buy cheap Chery Kaifeng Plant 30JPH Capacity Improvement Project from wholesalers
    • Buy cheap Chery Kaifeng Plant 30JPH Capacity Improvement Project from wholesalers

    Chery Kaifeng Plant 30JPH Capacity Improvement Project

    Ask Lasest Price
    Brand Name : CEI-Kinte
    Certification : ISO9001/FEM/ISO14001/OHSAS 18001
    Model Number : Customized
    Price : Negotiable
    Delivery Time : According to customer's requirement
    Payment Terms : Negotiable
    Supply Ability : Strong production capacity
    • Product Details
    • Company Profile

    Chery Kaifeng Plant 30JPH Capacity Improvement Project

    Chery Kaifeng Plant 30JPH Capacity Improvement Project


    1. Project name:

    Chery Kaifeng Plant 30JPH Capacity Improvement Project

    2. Project time:

    December 2019

    3. Project location

    Chery Kaifeng Plant

    4. Project introduction:

    Models: 5 models (X70/X90/X90 base model/X95/65EV)

    Capacity: 30JPH

    Beat: 108S

    Robots: NACHI, EFORT and KUKA brands, quantity 99 units

    Model switching form: side trihedral turntable, side wheel cover online flexible hemming, engine room cross slide table switching library system, main off-line rolling bed skid conveyor system, general assembly GEO gripper positioning system, robot automatic glue coating system

    5. Core technology:

    1. On-line flexible hemming of side trihedral turntable and side wheel cover

    2. Switching warehouse system of engine room cross slide table, main off-line rolling bed skid conveying system

    3. The total GEO gripper positioning system and robot automatic glue application system


    As one of the four major processes in the automotive industry, the welding process is self-evident. It shoulders the important mission of forming the body and providing a supporting frame for the vehicle. In addition to ensuring the appearance and shape, it must also ensure that all parts of the final assembly The precision of the component installation point, so its process is far more complicated than the other three major processes. The planning and layout of the production line not only need to consider from the aspects of precision assurance, production efficiency, distribution logistics, and storage, but are also limited by the plant area and structure, Existing conditions such as painting corridors. There is no perfect layout plan, only the most suitable layout plan at present.


    6. Logistics and warehousing planning


    Logistics warehousing planning should be considered comprehensively in combination with process layout and production tempo, and should roughly follow the following principles:


    (1) The size of the storage area should meet the basic inventory requirements. The basic inventory is generally not less than 2 hours of consumption. The area of the storage area should be calculated based on the total number of parts, the size of the parts station and equipment, and the number of frames to ensure that the area is not less than the area required for 2 hours of inventory.


    (2) The storage area should be close to the logistics door of the workshop and the logistics channel of the factory area.


    (3) In consideration of logistics efficiency and space saving, the width of logistics channels between welding lines is generally about 3m.


    (4) Logistics channels must be reserved for all workstations that need to be loaded to ensure distribution space.


    (5) The logistics direction cannot be opposite to the overall flow direction of the body.

    Chery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement Project

    Quality Chery Kaifeng Plant 30JPH Capacity Improvement Project for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Guangzhou Kinte Electric Industrial Co., LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)